Contracting opportunities 
WW-647R: Biosolids Digester Facilities Project: Request / Notice for Proposal for T-31.01 Earthworks, Piling Foundations and Site Wide Dewatering Package 1




By posting Prime Bidders' requests for subcontracting opportunities, SFPUC makes no representations to the reader that the listed Prime Bidders are qualified or authorized to advertise services as licensed contractors.

  Description
 
  • Contact: Plans/Specs for this project are available by request through Tian Dong at tdong@malcolmdrilling.com. An NDA is required for these documents. Please email your request for plans/specs to Tian or they can be viewed at Malcolm Drilling's office located at 3503 Breakwater Court Hayward, CA 94545 between the hours of 8am - 5pm, Monday to Friday. If you need assistance with bonding, credit, insurance, or technical assistance with the plans and specs, please call us at 510.780.9181. 100% Payment and Performance bonds may be required. Additionally, please call us if you need assistance in obtaining equipment, supplies, or materials for this project. We look forward to working with you on this project, please email us your quote at tdong@malcolmdrilling.com. If you have technical questions regarding this bid, please contact Tian Dong at 510.780.9181 or tdong@malcolmdrilling.com.

  • Speciality: This is a request for interest from CMD Certified LBE Subcontractors as well as WBE/MBE Subcontractors. Spoil Handling, SWPPP planning and implementation, Mass excavation and backfill, Pile chipping, Pile removal, Survey, Trucking, Security, Resteel, Asphalt paving, Street sweeping, Concrete pumping, Concrete supply, Testing, Traffic management, Concrete Washout, Stairtower erection and rental, Contaminated soils testing, On Site demolition, Pre trenching, Work platform construction, Base rock placement

  • Record created: 04/20/20

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Plans/Specs for this project are available by request through Tian Dong at tdong@malcolmdrilling.com. An NDA is required for these documents. Please email your request for plans/specs to Tian or they can be viewed at Malcolm Drilling's office located at 3503 Breakwater Court Hayward, CA 94545 between the hours of 8am - 5pm, Monday to Friday. If you need assistance with bonding, credit, insurance, or technical assistance with the plans and specs, please call us at 510.780.9181. 100% Payment and Performance bonds may be required. Additionally, please call us if you need assistance in obtaining equipment, supplies, or materials for this project. We look forward to working with you on this project, please email us your quote at tdong@malcolmdrilling.com. If you have technical questions regarding this bid, please contact Tian Dong at 510.780.9181 or tdong@malcolmdrilling.com.

  • Speciality: Spoil Handling, SWPPP planning and implementation, Mass excavation and backfill, Pile chipping, Pile removal, Survey, Trucking, Security, Resteel, Asphalt paving, Street sweeping, Concrete pumping, Concrete supply, Testing, Traffic management, Concrete Washout, Stairtower erection and rental, Contaminated soils testing, On Site demolition, Pre trenching, Work platform construction, Base rock placement

  • Record created: 04/16/20

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
BACK TO CONTRACTS & BIDS LIST

Contact Information

  • SFPUC - Contracts Administration Bureau
  • 525 Golden Gate Avenue, 8th Floor
  • San Francisco, CA 94102
  • Phone: (415) 551-4603; Fax: (415) 554-3225
  • Email: CAB@sfwater.org