Bid Details
WW-628
Request for Proposals for Scope III Re-Bid Drilled Shafts SFPUC - Southeast Plant New Headworks Construction

Bid due

10/30/2019
2:00 PM

  • Type Professional Services
  • Department Infrastructure
BACK TO CONTRACTS & BIDS LIST
Project Description
While information may be periodically added to this Project Description page, it exists only as a courtesy. Please only rely on official updates provided by Sundt-Walsh and on Sundt-Walsh's SmartBid website: https://secure.smartbidnet.com/LAPW

ADVERTISEMENT FOR SUBCONTRACTOR PROPOSALS
Subject to conditions prescribed by the City and County of San Francisco, CA responses to this bid request are sought from subcontractors for Drilled Shafts.

PROJECT DESCRIPTION:
The intent of this project is to replace the existing Headworks Facility at the SE Water Pollution Control Plant with a new all-weather 250 MGD Headworks Facility.  This solicitation is for Scope III New Headworks Construction.

SCOPE / DRAWINGS:
The drawings for Scope III are included in the Plan Room on Smartbidnet.com.  The scope being sought for this project are as follows:
 
3-16 - Drilled Shafts and Inclinometers - 15% LBE Requirement 

PROJECT SCHEDULE:
Currently this work is scheduled to commence in the Winter of 2019.

PRE-QUALIFICATION OF PROSPECTIVE SUBCONTRACTORS:
The Owner has determined that subcontractors who submit bids to Sundt/Walsh on this Project must be pre-qualified.  Those subcontractors who pre-qualify will be allowed to bid on the above Scope of Work.   
 
Interested firms may obtain Pre-qualification Documents on the Smartbidnet.com website or by contacting David Cooley, via e-mail at dcooley@sundt.com.  All prequal documentation must be submitted by October 25, 2019.

LOCAL BUSINESS ENTERPRISE (LBE) REQUIREMENTS:
The following project-wide LBE participation requirement is: LBE-15%. Each Bid Package has a specific LBE requirement as indicated above.  Any proposals that fail to meet the Bid Package LBE requirement will be deemed non-responsive.

DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS: All subcontractors are hereby notified that it is expected that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB). Bidders shall comply with all applicable terms and conditions, special provisions, and reporting requirements, as set forth in these specifications, and as may be required by federal law, rule, or regulation.  Additionally, meeting the project-wide Fair Share Objective is encouraged: MBE-6.4%, WBE-2.0%. Refer to Contract Section 00 48 10.01, Paragraph 2 for more information.

BID DUE DATE: All bid documents must be submitted no later than October 30, 2019 by 2:00 p.m, California Time.

Confidentiality of the information provided will be respected to the extent permitted by law.

QUESTIONS: Direct all project specific questions to David Cooley at Sundt/Walsh. All questions should be submitted via e-mail. The e-mail address is Dcooley@sundt.com.  

Request for proposal

  • ESTIMATED COST
    Varies
  • DUE DATE
    10/30/2019
  • DUE TIME
    2:00 PM
  • DURATION
  • LOCATION
  • CONTACT
    David Cooley

Pre-Submittal Conference

  • DATE
  • TIME
  • ATTENDANCE
    Not Mandatory
  • LOCATION
  • ADVERTISEMENT DATE
    10/23/2019
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE