WW-647R
Biosolids Digester Facilities Project: Request for Proposal for Early Out Package 1D (EOP 1D) – Sewer Relocation Pile Foundations Trade Package

Bid due

11/05/2019
1:59 PM

  • Type Professional Services
  • Department Wastewater Enterprise
BACK TO CONTRACTS & BIDS LIST
Project Description
While information may be periodically added to this Project Description page, it exists only as a courtesy.  Please only rely on official updates provided by MWH Constructors / Webcor Builders Joint Venture and MWH/Webcor's BuildingConnected website. Direct all package specific questions to Daniela Pac at daniela.pac@mwhwebcor.com.

The invitation to submit a Bid shall be sent via email. Pre-qualified Trade Contractors shall receive an email with a link to BuildingConnected, where the pre-qualified Trade Contractors shall be able to download the RFP Documents. Bid Documents are available for download at MWH Constructors / Webcor Builders Joint Venture's  BuildingConnected website.

The Biosolids Digester Facilities Project (BDFP) aims to replace the existing digester facilities with new, expanded, reliable, modernized and relocated facilities, as well as improve energy recovery and maximize control of odors.

The Scope and Drawings for this Sewer Relocation Pile Foundations Trade Package shall be included as Exhibits in the RFP Package that will be available in BuildingConnected to already pre-qualified Trade Contractors. 

Currently this Work is scheduled to commence in November 2019, and Field Work is scheduled to start in the 1nd Quarter of 2020. 

The CM/GC has pre-qualified potential trade contractors to submit bids on this bid package. Together with the Owner, MWH/Webcor JV has pre-qualified the following Trade Contractor to submit bids on the Demolition and Site Readiness Package:

Malcolm Drilling Company, Inc.

The above listed pre-qualified trade subcontractor has the first right of refusal to submit a bid for this trade package.

The lower tier subcontractors/suppliers interested in submitting a bid/quote on this trade bid package should contact the listed pre-qualified bidders to submit their bids. 
The project-wide LBE participation requirement is: LBE - 12%. Each Bid Package has a specific LBE requirement. This Sewer Relocation Pile Foundations Trade Package LBE participation requirement is: LBE - 20%. Any proposals that fail to meet the Bid Package LBE requirement will be deemed non- responsive. 

Trade Contractors are hereby notified that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (CWSRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB), and the Water Infrastructure Finance and Innovation Act (“WIFIA”), also administered by the US EPA. Trade Contractors shall comply with all applicable terms and conditions, special provisions, and reporting requirements, as set forth in these specifications, and as may be required by federal law, rule, or regulation. Refer to Contract Section 00 48 10.01 for more information.

Trade Contractors are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (“DBEs”) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are project-wide participation goals that the Contractor may seek to meet:
MBE:  5.6%, WBE: 1.2%
The Local Hiring Goal for the Construction Phase of the BDFP Project is 30%.

In accordance with California Labor Code Sections 1771.1 and 1725.5, no contract can be awarded to a Proposer without proof that the Proposer and all identified subcontractors are currently registered with the California Department of Industrial Relations. 

The CM/GC held a pre-bid meeting on September 19, 2019 for this package.

All bid documents must be submitted no later than November 5, 2019 by 1:59 PM PST. Confidentiality of the information provided will be respected to the extent permitted by law 

Request for proposal

  • ESTIMATED COST
    Varies
  • DUE DATE
    11/05/2019
  • DUE TIME
    1:59 PM
  • DURATION
  • LOCATION
  • CONTACT

Pre-Submittal Conference

  • DATE
    09/19/2019
  • TIME
    9:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    Contractor Assistance Center, 150 Executive Park Blvd #1300, San Francisco, CA 94134
  • ADVERTISEMENT DATE
    09/16/2019