WW-681
Oceanside Water Pollution Control Plant Odor Control Optimization

Bid due

11/29/2018
2:00 PM

  • Type Construction
  • Department Wastewater
BACK TO CONTRACTS & BIDS LIST
Project Description
The objective of the project is to upgrade and optimize the operation of the existing odor control units (OCUs) and subsequent ventilation systems serving building 042 – primary clarifiers and building 230 – secondary clarifiers at Oceanside Water Pollution Control Plant (OSP). The work is to be performed in San Francisco, California. The Engineer's estimate is between $ 2,500,000 and $2,700,000. The Contract will be awarded to the lowest responsible and responsive bidder.

Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. The LBE Subcontracting Participation Requirement is 20.00% and ONLY San Francisco (Local) Small & Micro-LBEs can be utilized to meet this requirement (Firms certified by SF Contract Monitoring Division). SFPUC-LBEs cannot be utilized to meet the 20.00% LBE Subcontracting Participation Requirement. Please contact LaKysha Cummings at (415) 554-3136 for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: Class A General Engineering Contractor, Hazardous Materials Contractors (HAZ), C-4 Boiler / Hot water / Steam Fitting Contractor, C-8 Concrete Contractor, C-10 General Electrical Contractor, C-12 Earthwork & Paving Contractor, C-20 Heating, Ventilation, Air Conditioning Contractor, C-21 Building Moving / Demolition Contractor, C-33 Painting and Decorating Contractor, C-36 Plumbing Contractor, C-50 Reinforcing Steel Contractor, C-51 Structural Steel Contractor, HVAC Equipment and Accessories, Pipes, Valves and Fitting Supplies, Lighting Supplies, Electrical Equipment and Supplies . Please refer to Section 01 60 00 in the Specifications regarding the purchase of equipment to achieve the LBE subcontracting participation requirement.

A DVD version of the bidding documents, plans, and specifications, and available project information is available by mail or at 525 Golden Gate Avenue, 1st Floor, Customer Service Desk, San Francisco, CA 94102 for a nonrefundable $10.00 fee paid by check payable to "SFPUC." Hard copy versions of the plans and specifications are only available by mail or by appointment for pick up for an additional fee of $150.00. If requesting by mail, send a check in the appropriate payment amount, requestor’s carrier account number, a business card, a contractor license number, and return shipping information to: Contract Administration Bureau, 525 Golden Gate Avenue, 8th Floor, San Francisco, CA 94102. Call (415) 551-4603 for further information or to make an appointment to obtain a hard copy. Visit http://sfwater.org/contracts for updates. Please be advised that prior to receiving these materials, all purchasers will be required to complete, sign, and fully comply with a Confidentiality Agreement.

Request for proposal

  • ESTIMATED COST
    $2,500,000 to $2,700,000
  • DUE DATE
    11/29/2018
  • DUE TIME
    2:00 PM
  • DURATION
  • LOCATION
    525 Golden Gate Avenue, 3rd Floor - Tuolumne Room, San Francisco, CA
  • CONTACT
    Contract Administration Bureau

Pre-Bid Conference

  • DATE
    10/30/2018
  • TIME
    9:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    3500 Great Highway, Building 930 - 2nd Floor OSP Conference Room
  • ADVERTISEMENT DATE
    10/18/2018
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE