San Francisco Water, Power and Sewer has implemented a pre-qualification program to determine bidder responsibility prior to submission of bids for select projects. Bidders for designated construction projects must be pre-qualified prior to submitting bids. It is mandatory that all licensed contractors who intend to submit bids for these designated projects, fully complete the following:

Pre-qualification application packages may be submitted at any time throughout the year. We require a minimum of 30 days to process a pre-qualification application following submittal of all required documents, including timely receipt of Reference Questionnaires. Pre-qualification approval will remain valid for two (2) calendar years from the posted approval date. Licensed contractors who intend to renew their pre-qualification status must submit new updated Parts I, II, and III, including new references. An updated Part 4 for previously approved project categories is not required for renewal.

 

Water Tunnels - Conventional
Request for Qualifications Part IV - Regional Water Tunnels

No projects at this time.

 

Water Tunnels - TBM
Request for Qualifications Part IV - Regional Water Tunnels - Conventional

No projects at this time.

 

Large Diameter Pressure Pipelines (48 inches or greater)
Request for Qualifications Part IV - Regional Water Piplelines Greater than 48"

  • Peninsula Pipelines Seismic Upgrade (WD-2727)
    Estimated Contract Value: $20M - $25M
    Estimated Advertisement Date: November 2013
 

Valve Lots
Request for Qualifications Part IV - Regional Water Valve Lots

No projects at this time.

 

Water Treatment Plants
Request for Qualifications Part IV - Regional Water Treatment Plants

No projects at this time.

 

Structural Upgrades / Retrofits
Request for Qualifications Part IV - Regional Water Structural

  • San Antonio Backup Pipeline (WD-2575)
    Estimated Contract Value: $34M - $38M
    Estimated Advertisement Date: October 2011

 

*Estimated Contract Values and Estimated Advertisement Dates may be subject to change. A separate pre-qualification process with project-specific Request for Qualifications will be conducted for each Stand Alone Regional Water Project. Links to the RFQ will be issued 3-6 months prior to the Estimated Advertisement Date. Potential bidders are encouraged to submit pre-qualification packages as soon as possible, so that they may be notified of pre-qualification status well in advance of upcoming projects.

For questions on pre-qualification, please send an email to: prequal@sfwater.org or leave a voicemail at (415) 551-4603.

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 11/14/2013 2:33:07 PM