Reservations                              butterfly image


 
TYPE DATE TIME LEVEL DESCRIPTION AVAILABLE
 
 
Hike 8/15/2015 9:30 8 miles Hike from Cemetery Gate at MM1.5 to MM 5.75 and back. *note: Meet at the turnout on north side of Highway 92 at Upper Skyline Blvd. just before the entrance to Skylawn Cemetery 15
Hike 8/23/2015 9:30 8 miles Hike from Skyline Quarry to MM 4 and back 18
Bike 8/30/2015 9:00 11 miles Ride from Cemetery Gate, note: Meet at the turnout on north side of Highway 92 at Upper Skyline Blvd. just before the entrance to Skylawn Cemetery. Ride from MM 1.5 out to MM 7.0. 10 foot service road, no technical/single track work, climbing for sure, Riders must be in good cardiovascular conditioning. 15
Hike 9/13/2015 9:00 13 miles One-way hike from Sneath Lane Gate to Quarry. Auto shuttle must be arranged. 10
Hike 9/20/2015 9:30 5 - 8 miles Hike from Cemetery Gate, *note: Meet at the turnout on north side of Highway 92 at Upper Skyline Blvd. just before the entrance to Skylawn Cemetery 10