Bid Details
WW-647R
RFQ for Biosolids Digester Facilities - Southeast Treatment Plant T-40.04 Process Control Systems Integrator (PCSI) Supply and Installation

Bid due

02/04/2021
5:00 PM

  • Type Professional Services
  • Department Infrastructure
BACK TO CONTRACTS & BIDS LIST
Project Description
The Request for Qualifications (RFQ) documents may be found online via BuildingConnected at MWH/Webcor BuildingConnected Website:   

https://app.buildingconnected.com/public/5f88c2a2434c30003918ea48

After accessing the link, Applicants will be directed to a BuildingConnected Public Plan Room where Applicants will find the RFQ packages and instructions on how to download the RFQ documents.  Applicants shall submit statements of qualifications to MWH/Webcor via BuildingConnected Website NO LATER THAN February 4th, 2021. 

This work will be performed at the Southeast Treatment Plant.  This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times.  A brief description of the work and cost range for each package is:

T-40.04 Process Control Systems Integrator (PCSI) Supply and Installation
Design, Supply, Installation and, Commissioning of Process Wastewater instrumentation and communications networks. Overall control function is on a Distributed Control System. 

The scope includes the following examples:
1. Control Panels
2. Misc. I/O Panels 
3. Instrumentation hardware 
4. Profi-bus infrastructure 
5. Process backbone infrastructure 
6. Process package vendor coordination 
7. Commissioning and supervision 

Applicants who pre-qualify as Bidders are hereby notified that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB), and the Water Infrastructure Finance and Innovation Act (WIFIA), also administered by the US EPA.  

Applicants who pre-qualify as Bidders are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (DBEs) for their subcontracting and procurement needs.  These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project.  These are project-wide participation goals that the Contractor may seek to meet:

1. 5.6% MBE

2. 1.2% WBE

The project wide goal for Local Business Enterprise participation for the Project is 12% of the Contract Sum.  The Local Hiring Goal for the Construction Phase of the Project is 30% and 50% for apprentices for each trade. In accordance with California Labor Code Sections 1771.1 and 1725.5, no contract can be awarded to a Bidder without proof that the Bidder and all identified subcontractors are currently registered with the California Department of Industrial Relations.

Request for proposal

  • ESTIMATED COST
    Varies
  • DUE DATE
    02/04/2021
  • DUE TIME
    5:00 PM
  • DURATION
  • LOCATION
    https://app.buildingconnected.com/public/5f88c2a2434c30003918ea48
  • CONTACT

Pre-Submittal Conference

  • DATE
  • TIME
  • ATTENDANCE
    Not Mandatory
  • LOCATION
  • ADVERTISEMENT DATE
    01/04/2021
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE