Bid Details
WW-662
REJECTED: Southeast Water Pollution Control Plant Power Feed and Primary Switchgear Upgrades

Bid due

05/23/2019
2:00 PM

  • Type Construction
  • Department Wastewater
BACK TO CONTRACTS & BIDS LIST
Project Description
The objective of the project is to increase reliability, redundancy and capacity of the electrical system at Southeast Water Pollution Control Plant (SEP) by upgrading the existing 12 kV primary feed from Hunters Point switchyard and obtaining a new 12 kV feed from Potrero switchyard to provide redundancy for SEP facilities. Contract work consists of constructing a new two-story building over the existing switching station to house the new primary switchgear. In addition, aging substations will be replaced and new power monitoring and control system will be installed for additional reliability and efficiency. The work is to be performed in San Francisco, California.

There will be no bid discounts for this contract. The LBE Subcontracting Participation Requirement is 10.00% and ONLY San Francisco (Local) Small & Micro-LBEs can be utilized to meet this requirement (Firms certified by SF Contract Monitoring Division). SFPUC-LBEs cannot be utilized to meet the 10.00% LBE Subcontracting Participation Requirement. The 10.00% LBE subcontracting participation requirement was established in consideration of the project involving medium-voltage (12 kilo-volt) electrical equipment for power distribution at SEP, a large industrial facility. Installation, testing, and commissioning of the medium voltage system will require workers with specialized working knowledge and skill level, certified for medium voltage work. Please contact Lakysha Cummings at (415) 554-3136 for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: concrete, structural steel, plumbing, micro-piling and electrical. Please refer to Section 01 60 00 in the Specifications regarding the purchase of equipment to achieve the LBE subcontracting participation requirement.

A DVD version of the bidding documents, plans, and specifications, and available project information is available by mail or at 525 Golden Gate Avenue, 1st Floor, Customer Service Desk, San Francisco, CA 94102 for a nonrefundable $10.00 fee paid by check payable to "SFPUC." Hard copy versions of the plans and specifications are only available by mail or by appointment for pick up for an additional fee of $300.00. If requesting by mail, send a check in the appropriate payment amount, requestor’s carrier account number, a business card, a contractor license number, and return shipping information to: Contract Administration Bureau, 525 Golden Gate Avenue, 8th Floor, San Francisco, CA 94102. Call (415) 551-4603 for further information or to make an appointment to obtain a hard copy. Visit http://sfwater.org/contracts for updates. Please be advised that prior to receiving these materials, all purchasers will be required to complete, sign and fully comply with a Confidentiality Agreement.

An informal site visit will be held on
Tuesday, April 30, 2019 at 9:00 am at:
Bruce Flynn Pump Station
1700 Evans Avenue
San Francisco, CA 94124
Please meet at the entrance on Rankin Street 
between Evans Avenue and Davidson Avenue

Request for proposal

  • ESTIMATED COST
    $25,000,000 to $30,000,000
  • DUE DATE
    05/23/2019
  • DUE TIME
    2:00 PM
  • DURATION
  • LOCATION
    525 Golden Gate Avenue, 3rd Floor – Tuolumne Room, San Francisco, CA 94102
  • CONTACT
    Contract Administration Bureau

Pre-Bid Conference

  • DATE
    03/20/2019
  • TIME
    10:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    Southeast Water Pollution Control Plant, 750 Phelps Street, San Francisco, CA 94124
  • ADVERTISEMENT DATE
    03/05/2019
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE