Bid Details
HH-980
Lower Cherry Aqueduct Rehabilitation - Phase 1 - BID TABULATION

Bid due

02/01/2018
2:00 PM

  • Type Construction
  • Department HH Water & Power
BACK TO CONTRACTS & BIDS LIST
Project Description

The objective of the project will be to complete repairs along the Lower Cherry Aqueduct system, including work at Cherry Creek diversion dam, open canal reaches, pipe aerial crossing, and forebay. The scope of the project will include: rehabilitation of the existing Cherry Creek diversion dam, installation of two (2) new sluice gates with control unit and four (4) new slide gates, replacement of the hydraulic control room and gatehouse, rehabilitation of the diversion dam access trail, repair of reinforced concrete saddles at the aerial crossing, installation of 5,107 linear feet of pipe rail fence along open canal reaches, installation of three (3) bridges spanning the open canal, replacement of the 16-inch forebay drain pipe, and construction of a cover over the top of the existing forebay. The work is to be performed in Stanislaus, CA.

This project is funded through California State grant funds and is eligible for FEMA reimbursement; S.F. Administrative Code Chapter 14B is not applicable and there is no LBE or DBE subcontracting requirement for this project. However, Bidders are encouraged to use of DBE firms, San Francisco Local Certified Small & Micro-LBEs and regional SFPUC-LBEs to the extent possible.

Hard copy versions of plans, specifications and bidding documents are available at 525 Golden Gate Avenue, 1st Floor, Customer Service Desk, San Francisco, CA 94102 for a non-refundable $150 fee paid by cash or by check payable to “SFPUC.” Call (415) 551-4603 for further information. A CD version of the plans, specifications, and available project information is available to paid Planholders only for an additional fee of $10. Visit http://sfwater.org/contracts for updates. Please be advised that prior to receiving these materials, all purchasers will be required to complete, sign and fully comply with a Confidentiality Agreement.

 An additional site inspection will be held at requested locations along the Lower Cherry Aqueduct Alignment on Monday, January 29, 2018. Meeting location for the additional site visit will be at 1-Lakeshore Drive, Moccasin, CA Main Dining Room at 10:00 AM. A City Representative will be available to escort Contractors from Moccasin to the Lower Cherry Aqueduct Site. This site visit will provide contractors an opportunity to see City supply materials located in Moccasin (such as sluice gates/slide gates).

Request for proposal

  • ESTIMATED COST
    $2,410,000
  • DUE DATE
    02/01/2018
  • DUE TIME
    2:00 PM
  • DURATION
    .
  • LOCATION
    525 Golden Gate Ave, 9/F Crystal Springs Rm, SF, CA
  • CONTACT
    Contract Services

Pre-Bid Conference

  • DATE
    01/12/2018
  • TIME
    10:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    1 Lakeshore Drive, Administration Building Dining Room, Moccasin, CA. 95347
  • ADVERTISEMENT DATE
    12/29/2017
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE