Bid Details
ITB-006
Green Infrastructure (Bio Retention) on The Van Ness Improvement project

Bid due

08/15/2017
3:00 PM

  • Type Construction
  • Department SFMTA
BACK TO CONTRACTS & BIDS LIST
Project Description

Project is a 2.25-mile length of Van Ness Avenue from Lombard Street to Mission Street consisting of Bus Rapid Transit lanes and stations, SFMTA overhead contact system and pole replacement, modernization and improvement of the traffic signal system, replacement of San Francisco Public Utilities Commission’s sewer and water main, auxiliary water supply system (AWSS) upgrades, green infrastructure facilities, landscaping & irrigation, and Landscaping.

Work required to install bio-retention facilities on Van Ness between Grove Street and Golden Gat Avenue. Scope includes CIP concrete, pre-cast curbs, infiltration testing, retention basin backfill planting and irrigation, catch basins, 6-month operation and maintenance period.

Request for proposal

  • ESTIMATED COST
    $259,000.00
  • DUE DATE
    08/15/2017
  • DUE TIME
    3:00 PM
  • DURATION
    ..
  • LOCATION
    180 Redwood Street, Suite 300. SF CA 94102
  • CONTACT
    vannessbids@walshgroup.com

Pre-Bid Conference

  • DATE
    07/25/2017
  • TIME
    10:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    600 Van Ness Ave, (at Golden Gate) SF CA 94102
  • ADVERTISEMENT DATE
    07/20/2017
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE