Project Description

The San Francisco Public Utilities Commission (SFPUC), a department of the City and County of San Francisco (the City), seeks to retain the services of a design-build firm to provide design and construction services for the Warnerville Substation Rehabilitation Project (“Project”) located in Oakdale, CA.  Design-build services will include, but not be limited to, turnkey planning, design, engineering, labor, materials procurement, delivery, installation, and commissioning of the Warnerville Substation with two new transformers (300 MVA) replacing the three existing transformers (150MVA, 75 MVA, 75MVA).

The City has pre-qualified the following entities through a Request for Qualifications process:  

- Asplundh Construction Corp./Kiewit Engineering & Design Co.

- Barnard Construction/NV5 Holdings Inc.

- Beta Engineering California LP

- Communication Services, Inc./Worley Parsons Group Inc.

- EPC Services Company/Electrical Consultants Inc.

- PAR Electrical Contractors, Inc./Mesa Associates Inc.

- PowerSecure, Inc./Sega Inc.

- RES System 3, LLC/Renewable Energy Systems Americas Inc.

- Rosendin Electric, Inc./TriAxis Engineering

- TRC Solutions, Inc.

- Wilson Utility Construction Co./Sargent & Lundy

Only these entities will be permitted to submit Proposals.  This list will continue to be updated.

In order to review the Appendices to this Request for Proposal, please download a Confidentiality Agreement from the "Documents" tab and submit it to QBD@sfwater.org.

Addendum No.1 issued February 7, 2017.  Download from "Documents" for details.

Addendum No.2 issued March 15, 2017.  Download from "Documents" for details.

Addendum No.3 issued April 7, 2017.  Download from "Documents" for details.

Addendum No.4 issued April 19, 2017. Download from "Documents" for details.

Addendum No. 5 issued April 21, 2017. Download from "Documents" for details.

Pre-Submittal Conference and Site Visit (1/24/17):  Please Note: Location has been moved to the Moccasin Admin Building Dining Room. 

Design Builders are strongly encouraged to attend a site visit facilitated by SFPUC project staff to be held immediately after the pre-submittal conference.  

Requests for information

All requests for information concerning the RFP, whether submitted before or after the Pre-Submittal conference, must be in writing and directed to Kyndra Cox at QBD@sfwater.org. 

 

Request for proposal

  • ESTIMATED COST
    $26,800,000
  • DUE DATE
    04/24/2017
  • DUE TIME
    2:00 PM
  • DURATION
    .
  • LOCATION
    525 Golden Gate Ave, 8th Floor San Francisco, CA 94102
  • CONTACT
    Contract Services

Pre-Submittal Conference

  • DATE
    01/24/2017
  • TIME
    10:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    10470 Moccasin Switchback Road, Junction Hwy 120 and Hwy 49 Moccasin, CA 95347
  • ADVERTISEMENT DATE
    01/10/2017
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE